| Tube product line |
 |
 |
 |
 |
| ¨‹ |
phoshor coating |
sealing |
tube connection |
exhausting | |
| Hardware assembly line |
 |
 |
 |
 |
| ¨‹ |
inductance production |
hardware assembly |
hardware connection |
i.c detection | |
| lamp assembly line |
 |
 |
 |
 |
| ¨‹ |
cement covering |
assembly |
finished product printing |
finished product packing | |
| general quality control |
 |
 |
 |
 |
| ¡¡ |
finished product operation |
hardware detection |
lamp quality detection |
quality control | |